Solar Power Plant Installation: Household Rooftop to Megawatt Utility-Tied Projects

Tachyons Energy Private Limited designs, installs, tests and grid-connects solar power plants in Kerala and across India, from household rooftop systems of a few kilowatts to commercial and industrial plants and megawatt-scale utility-tied projects. For homes and businesses it handles the survey, installation and the utility net-metering connection; for megawatt plants it also builds the inverter and transformer stations, the evacuation substation and line, and synchronises the plant with the grid.

  • Rooftop · kW
  • C&I · kW to MW
  • Utility-tied · MW
  • LT / 11kV / 33kV evacuation

Household rooftop solar on net metering

Residential rooftop systems are commonly a few kilowatts, sized to the household’s consumption and the shade-free roof area. An on-grid (grid-tied) system has no battery: the inverter converts the panels’ DC output to AC, the home uses that power first, and any surplus is exported to the grid. Under the utility’s net-metering arrangement a bidirectional meter records both import and export, so exported units are set off against the units drawn from the grid.

  • Site survey covering roof structure, orientation, shading and connected load
  • Module mounting structure suited to RCC, sheet or tiled roofs
  • DC cabling, string protection and inverter installation
  • Earthing, surge protection and lightning protection
  • Net-meter application, document preparation and utility inspection support

Commercial and industrial solar plants

Factories, campuses, hospitals and commercial buildings use rooftop, carport or ground-mount plants ranging from tens of kilowatts to the megawatt range. The engineering question is less about the panels than about how the plant joins the existing electrical system: at the LT panel for smaller plants, or at the HT incomer through a step-up transformer for larger ones. We integrate the plant with the site’s existing switchgear, protection and any diesel generator sets so that solar, grid and DG operate together safely.

  • Interconnection at the LT main panel or the HT incomer
  • Reverse-power, anti-islanding and protection relay settings
  • Zero-export or controlled-export arrangements where the site requires them
  • Synchronisation with DG sets where present
  • Energy metering and plant monitoring

Megawatt utility-tied solar plants

For grid-connected megawatt plants the electrical balance of plant usually sets the schedule: inverter stations, step-up transformers, HT switchgear and the evacuation line to the utility substation. Because Tachyons Energy also builds substations from 11kV to 440kV, we can deliver the plant’s grid interface — the evacuation bay, line, protection and metering — with the same team that installs the solar field. The plant is tested against the utility’s and the CEA’s connectivity requirements before synchronisation.

  • Inverter and transformer stations with HT switchgear
  • 11kV / 33kV and higher evacuation bays and lines
  • Plant SCADA, ABT metering and grid-code protection
  • Pre-commissioning tests of transformers, switchgear, cables and relays
  • Utility approvals, joint inspection and grid synchronisation

Approvals, inspection and grid connection

Every grid-connected solar plant needs the distribution utility’s consent before it is connected — for most consumers in Kerala that is KSEB approval and inspection under its rooftop solar and net-metering procedures. Larger installations also need State Electrical Inspectorate approval where applicable, and megawatt plants follow CEA regulations for connectivity to the grid. Government subsidy schemes may be available for some categories of consumer; eligibility and amounts depend on current government and utility rules, so we check them at the time of application.

HOW THE WORK RUNS

How we deliver solar plant installation

  1. 01

    Site survey and load study

    Roof or land assessment, shading analysis, review of electricity bills and connected load, and the point of interconnection.

  2. 02

    System design

    Plant capacity, module layout, inverter selection, single-line diagram, cable sizing and protection scheme, with the yield estimate for the site.

  3. 03

    Utility application and approvals

    Net-metering or connectivity application to the utility, and Electrical Inspectorate submissions where the plant size requires them.

  4. 04

    Installation

    Mounting structures, modules, DC and AC cabling, inverters, earthing and lightning protection; for MW plants, transformer stations and the evacuation bay and line.

  5. 05

    Testing and inspection

    Insulation resistance, polarity and string checks, earthing measurement, protection and anti-islanding tests, followed by the utility and inspectorate inspection.

  6. 06

    Grid connection and handover

    Net meter installation or grid synchronisation, performance check under load, and handover of as-built drawings, test reports and O&M documents.

QUESTIONS & ANSWERS

Solar Plant Installation: common questions

Straight answers to what clients ask us most before a project starts.

Is on-grid or hybrid solar better for a home in Kerala?

An on-grid system is the lower-cost choice when the grid supply is reliable and the main goal is reducing the electricity bill through net metering. A hybrid system adds a battery so that selected loads keep running during power cuts, at a higher cost. The right choice depends on how often and how long outages last at your location, and which loads you need backed up.

Does an on-grid solar system work during a power cut?

No. A grid-tied inverter is required to stop exporting when the grid fails (anti-islanding protection), so that utility staff working on a supposedly dead line are not put at risk. The system restarts automatically when the grid returns. If you need power during outages, you need a hybrid system with a battery.

What approvals are needed to connect rooftop solar to the grid?

You need the distribution utility’s approval under its net-metering procedure — KSEB for most consumers in Kerala — which typically involves an application, a technical feasibility check, installation, inspection and fitting of a bidirectional net meter. Larger installations may also need State Electrical Inspectorate approval. The exact steps and documents depend on the utility’s current rules and the system size.

What size of solar system does my home or factory need?

The size is set by your annual energy consumption, the shade-free roof or land area available, and the utility’s limits on connected capacity for your connection. Residential systems are commonly a few kilowatts, while commercial and industrial plants range from tens of kilowatts upward. A site survey and a review of 12 months of electricity bills is the reliable way to fix the capacity.

Can you build the evacuation substation and line for a megawatt solar plant?

Yes. Tachyons Energy builds substations from 11kV to 440kV, so for megawatt plants we can deliver the step-up transformers, HT switchgear, evacuation bay, line, protection and metering along with the solar plant. This keeps the plant and its grid interface under one contractor through testing and synchronisation.

Are solar subsidies available for rooftop systems in Kerala?

Subsidy schemes may be available for some categories of consumer, particularly residential rooftop systems. Eligibility, amounts and the application route are set by current central and state government and utility rules, and they change over time. We check the scheme in force when you apply rather than quoting a fixed figure.