MODERN SUBSTATIONS
IEC 61850
For digital and newly built substations, MoniTach joins the station bus as an IEC 61850 client and reads the IEDs directly, without duplicating sensors that the protection and control system already has.
FLAGSHIP PRODUCT · 220kV / 440kV
MoniTachThe Tachyons Yard Intelligence
Real-time condition monitoring, predictive fault diagnostics and remote actuation for EHV yards and substation control panels — eliminating manual hazardous inspections near live high-voltage terminals.
Proprietary system engineered by Tachyons Energy. Supervises and reports alongside your protection scheme; remote actuation is permission-controlled, interlocked and logged.
Bay supervision
SIMULATEDLIVE DEMO
A simulated 220kV / 440kV operator console running in your browser — the views your control-room team would work from.
SIMULATED DATA · for demonstration
MoniTach
Switchyard & control panel remote monitoring
Applies to Bay 204 · 220kV Feeder-1 · watch the cards and the event log
Last operation
—
by Remote operator
Operations
1284
Contact life
87.4%
Motor current · peak 11.4 A · 6.0 s run
Healthy ≥ 1.2 mA · continuous
Close interlocks
Two-step select → execute · selection disarms after 5 s · every command is logged
Density @20°C
6.00bar
Measured
6.35bar
Gas temp
37.2°C
Temp-compensated · rated 6.0 bar
Trend · 60 s
Busbar kV · 3-phase
V R-Y
220.4
V Y-B
219.8
V B-R
220.2
Line I
420A
Active
154.5MW
Reactive
42.0MVAr
PF
0.965
Freq
50.00Hz
Apparent
160.1MVA
Line current · 60 s
Termination · 60 s
Scale 20–110 °C│ Warning ≥ 75 °C│ Hotspot ≥ 90 °CAmbient 31 °C
OTI · oil
58.4°C
WTI · winding
66.9°C
OLTC tap · AVR auto
09 / 17
In production, unacknowledged alarms escalate automatically by SMS and voice call to the on-call engineer.
No one entered the yard to read these values.
Simulated data · values and scenarios are illustrative, not from a live substation
INTERACTIVE ARCHITECTURE
Select any monitored component to trace its signal from the field sensor, through the yard PLC and optical fibre, to the control-room gateway, dashboard and alerting — and to see exactly what is measured.
System architecture · yard → fibre → control room
Tap a component in the diagram, or use the list below (arrow keys move between items).
Monitored components
220kV / 440kV Yard Components
Control & Distribution Panel Components
220kV / 440kV Yard Components
Parameters monitored
Sensing method · typical
Density transmitter with integral temperature compensation, mounted on the compartment alongside (not replacing) the existing density monitor contacts; 4–20 mA or Modbus output to the yard PLC.
Early warning looks like
A slow, steady decline in compensated density over days or weeks while still above the alarm stage — the signature of a micro-leak at a flange, seal or valve.
Action it enables
Plan leak detection and gas top-up before the density reaches the breaker’s own low-density alarm or operation-block stage.
Signal path
A supervision and reporting layer: protection relays and their trip schemes remain fully in charge of clearing faults. Sensor types, sampling intervals and alarm set-points shown here are typical and are configured per site with the O&M team.
COMMUNICATION & INTEGRATION
MoniTach connects to a substation the way that substation is built: over the IEC 61850 station bus where IEDs are networked, over Modbus for meters and PLCs, and by hardwired signals for legacy equipment.
MODERN SUBSTATIONS
For digital and newly built substations, MoniTach joins the station bus as an IEC 61850 client and reads the IEDs directly, without duplicating sensors that the protection and control system already has.
METERS · PLCs · SENSORS
Multifunction meters, yard PLCs, gas-density transmitters and thermal sensors are polled over Modbus, on Ethernet or RS-485, and carried to the control room on optical fibre.
LEGACY EQUIPMENT
Older electromechanical gear is covered with potential-free contacts and 4–20 mA signals wired to the yard data concentrator, so a mixed-age yard appears on one dashboard.
Station bus · fibre Ethernet
Protocol scope, IED list and northbound interfaces are fixed per project from the signal list.
OPERATIONAL & SAFETY CASE
What changes for the people who run the yard: fewer exposures near live equipment, cleaner data paths, and maintenance that is planned rather than forced.
Operators no longer need to enter energized 220kV/440kV switchyards or open live control panels to read gauges, check SF6 pressure, or verify breaker states — drastically reducing arc-flash and electrocution risks.
Complete electrical isolation between the high-voltage switchyard field sensors/PLCs and the central control room dashboard, preventing ground potential rise (GPR) and EMI/RFI surges from travelling into control-room equipment.
Catch degrading trip coils, rising terminal temperatures, or slow SF6 leaks weeks before a catastrophic grid trip occurs — and plan the fix into a scheduled outage instead of an emergency one.
Unify legacy and modern substation gear into a single, intuitive web/SCADA dashboard with instant SMS, voice and escalation alerts to the engineers on call.
BEFORE / AFTER
The same O&M duties, carried out without putting people next to live terminals to collect the data.
Duty
Manual yard rounds
Remote condition monitoring
DEPLOYMENT
Existing yards and new-build substations follow the same sequence, planned around outage windows so the asset stays in service as far as possible.
Retrofit compatibility
Works with legacy and modern gear alike: potential-free contacts and analogue repeaters from older electromechanical equipment, Modbus TCP/RTU from meters and PLCs, and IEC 61850 (MMS / GOOSE) from the IEDs of modern digital substations — presented together on one dashboard.
Engineering software & firmware
Embedded firmware, data acquisition and the dashboard platform are engineered by the group’s technology company.
Meet the group companiesSTEP 01
Walk-down of the yard and control room with your engineers; every point to be monitored is listed with its source, signal type and existing wiring.
Output · Signal list · I/O schedule
STEP 02
Transmitters, probes and the yard PLC / marshalling kiosk are installed during a planned outage window agreed with the utility, without disturbing protection wiring.
Output · Installed field I/O
STEP 03
Optical fibre routed through existing cable trenches, spliced and terminated in patch panels, then loss-tested end to end.
Output · Fibre test records
STEP 04
Edge gateway, historian and SCADA / web dashboard brought online; every point is verified from field device to screen.
Output · Point-to-point checks
STEP 05
Thresholds, trend alarms and escalation rosters set with the O&M team against each asset’s baseline and operating practice.
Output · Alarm philosophy
STEP 06
Operators and maintenance engineers trained on the console, alarms and reports; documentation and as-built drawings handed over.
Output · As-builts · O&M manual
DEPLOYMENT PROPOSAL
Share the voltage class, bay count and the equipment you want supervised. Our engineers will come back with a signal list, architecture and installation plan around your outage windows.