Tachyons Energy Private Limited designs and installs battery-based solar systems in Kerala and across India: hybrid solar with battery backup for homes and businesses, off-grid systems for sites without a grid supply, and battery energy storage systems (BESS) alongside commercial, industrial and megawatt solar plants. The scope covers load and backup assessment, inverter and battery sizing, DC protection and fire-safety provisions, installation, testing and integration with the grid and existing switchgear.

  • Hybrid
  • Off-grid
  • Solar + BESS
  • Home · C&I · MW

Grid-tied, hybrid, off-grid and solar + BESS: what the difference is

The four system types differ in whether they have a battery and how they behave when the grid fails. A grid-tied (on-grid) system has no battery and shuts down during a power cut by design. A hybrid system is grid-connected but adds a battery that keeps selected loads running during outages, while an off-grid system has no grid connection at all and depends on its battery bank. Solar + BESS refers to a larger battery energy storage system installed with a commercial or utility plant to shift, firm or smooth its output.

  • Grid-tied: no storage; exports and imports; stops on grid failure (anti-islanding)
  • Hybrid: battery bank; grid-connected; backs up selected loads on grid failure
  • Off-grid: battery bank essential; no grid connection; for remote and standalone loads
  • Solar + BESS: containerised or room-installed storage; grid-connected; for C&I and MW plants

Hybrid solar with battery backup for homes and businesses

A hybrid inverter combines a solar inverter, a battery charger and a backup supply in one unit: it runs the loads from solar first, charges the battery from surplus solar, and switches the backed-up loads to the battery when the grid fails. We separate the essential loads — lighting, fans, refrigeration, IT, pumps or a critical process — onto a backup distribution board so the battery is sized for what genuinely needs to run. Battery capacity and inverter rating are chosen from the backup load and the outage duration you want to ride through.

  • Backup load study and essential-load distribution board
  • Hybrid inverter and battery bank sizing for the required backup time
  • Lithium-ion or lead-acid battery installation as specified
  • Changeover, earthing and DC protection between battery, inverter and loads
  • Integration with net metering where the utility permits it for the system

Off-grid solar systems

Off-grid systems supply sites where the grid is unavailable or impractical to extend, such as remote buildings, farms, telecom or pumping loads. With no grid to fall back on, the design must cover the daily energy demand and the days of low sunshine from the panels and battery bank, often with a generator as backup. Load estimation is therefore more conservative than for a grid-connected system.

Battery energy storage systems (BESS) for C&I and megawatt plants

A BESS pairs a battery bank with a power conversion system (PCS) and a battery management system (BMS), usually in a container or dedicated room, connected to the plant’s LT or HT system. At commercial, industrial and utility scale it is used for backup, peak shaving to reduce maximum-demand charges, shifting solar energy into evening hours, and smoothing a plant’s export to the grid. Tachyons Energy handles the electrical integration — transformers, switchgear, protection, cabling and communication with the plant controls — along with the safety provisions the installation needs.

  • PCS, battery racks and BMS installation and integration
  • Connection at the LT panel or through a step-up transformer to HT
  • DC protection, isolation and earthing
  • Fire detection, ventilation and safety provisions as specified
  • Control integration with plant SCADA and energy management

HOW THE WORK RUNS

How we deliver hybrid solar & bess

  1. 01

    Load and backup assessment

    Review of consumption, outage pattern, essential loads and the backup duration or storage function required.

  2. 02

    System design and sizing

    Choice of hybrid, off-grid or BESS architecture, inverter or PCS rating, battery capacity, single-line diagram and protection scheme.

  3. 03

    Approvals

    Utility application for grid-connected systems and State Electrical Inspectorate approval where applicable.

  4. 04

    Installation

    Modules, inverters or PCS, battery racks, backup distribution, DC and AC cabling, earthing and safety provisions.

  5. 05

    Testing and commissioning

    Insulation and polarity checks, battery and BMS commissioning, changeover and backup tests on grid failure, and protection checks.

  6. 06

    Handover

    Operating instructions for backup and charging modes, as-built drawings, test reports and O&M documents.

QUESTIONS & ANSWERS

Hybrid Solar & BESS: common questions

Straight answers to what clients ask us most before a project starts.

What is the difference between a hybrid solar system and an off-grid solar system?

A hybrid system stays connected to the grid and uses its battery to back up selected loads during power cuts, so it can draw from the grid when solar and battery are low. An off-grid system has no grid connection and relies entirely on solar, its battery bank and usually a backup generator. Off-grid systems therefore need larger batteries and more conservative sizing.

How long will a solar battery backup last during a power cut?

Backup time is roughly the battery’s usable energy divided by the load connected to it, less inverter losses. For example, a battery with 5 kWh of usable energy running a 1 kW load would last a little under five hours, and longer if solar is still generating. It therefore depends on the battery size, the loads you choose to back up and the time of day.

Can I add a battery to my existing on-grid solar system?

Usually yes, either by replacing the grid-tied inverter with a hybrid inverter or by adding a separate battery inverter on the AC side (AC coupling). The better route depends on the existing inverter, the system size and the loads to be backed up. Where the system is on net metering, the utility may need to be informed of the change.

Will a hybrid system run my whole house or factory during a power cut?

It can, but backing up every load needs a much larger inverter and battery. Most systems back up only essential loads wired to a separate backup board, which keeps the battery size and cost reasonable. Heavy loads such as air conditioners, large motors or welding equipment are usually left off the backup circuit unless the system is sized specifically for them.

What is a battery energy storage system (BESS) used for in a solar plant?

A BESS stores energy so it can be used when it is most valuable: backing up critical loads, reducing peak demand charges, shifting solar output into the evening, or smoothing a plant’s export to the grid. It consists of battery racks, a power conversion system and a battery management system, connected to the plant’s LT or HT network. The right size depends on which of these functions it is meant to serve.

Which battery type is used for solar storage: lithium-ion or lead-acid?

Lithium-ion batteries, commonly lithium iron phosphate (LFP) for stationary storage, offer more usable capacity, longer cycle life and less maintenance than lead-acid, at a higher upfront cost. Lead-acid batteries remain in use for smaller backup systems where cost is the deciding factor. The choice depends on how often the battery will cycle, the space available and the budget.